Harnessing the Power of Hydro-Energy

Explore our commitment to clean energy through hydro-power solutions that benefit
both people and the planet. Discover our dedication to generating renewable energy that empowers
communities and fosters economic growth. 

124.8
MW

Total Energy Generation

50+
JOBS

Jobs Created

3
PROJECTS

Hydropower

Message from
the Chairman

It is with great pride and gratitude that I address you today as the Chairman of our distinguished hydropower company. On behalf of our esteemed Board of Directors, I extend heartfelt appreciation for your steadfast support and unwavering dedication to our shared vision of sustainable energy leadership.

Over the past year, our collective efforts have propelled us to remarkable heights. We have achieved significant advancements in enhancing the efficiency and reliability of our hydropower plants, thanks to the relentless pursuit of excellence by our dedicated team. Through the integration of cutting-edge technologies and streamlined processes, we have bolstered operational efficiency, minimized downtime, and ensured the seamless construction of new facilities.

Anup Acharya
Chairman

Projects

Jogmai
Hydro

Installed Capacity: 7.6 MW
Type of Scheme: Run-of-River (RoR)
Net Annual Energy: 42.875 GWh
Voltage Level: 33KV/10.7Km

Icon
Card Image

Jogmai
Cascade

Installed Capacity: 5.2 MW
Type of Scheme: Run-of-River (RoR)
Net Annual Energy: 29.89 GWh
Design Discharge: 5.26 m3/sec at Q40%

Icon

Seti Khola
Hydropower

Power Plant Capacity: 22MW
Type of Scheme: Run-of-River
Design Plant Discharge: 39.91m3 at Q42%
Annual Energy Generation: 133.432 GWh

Icon

Newsroom

Newsroom

Setikhola hydropower project begins power production

With the completion of the project development, the Setikhola Hydropower Project in Parbat district has started power generation. The project with the capacity of 3.5 megawatt has also started its test transmission, completing the entire development works in five years. The canal headwork of the project is at Beulibas of Paiyun Rural Municipality-2 while the powerhouse is at Ghangre of Bihadi Rural Municipality-6. Water has been supplied to Ghangre through a 3,600 metres long pipeline from Beulibas. China’s Asia Pacific Project carried out the electromechanical job of the project while K and K Builders from Biratnagar performed the pipeline works.
Newsroom

Jogmai Cascade Hydroelectric Project (5.2 MW)

Jogmai Cascade HEP is a cascade RoR type of scheme located just d/s of Jogmai khola small Hydroelectric Project-7.6 MW in Maijogmai rural municipality-3, Illam district of Nepal. The entire project component lies on right bank of Jogmai Khola within Maijogmai Rural Municipality. SEL has obtained survey license for Jogmai Cascade Hydropower Project in 2014 A.D. The feasibility study on the project was completed in 2018 A.D. Likewise; the initial Environmental Examination (IEE) Report on the project has been prepared. Power Purchase Agreement (PPA) concluded with Nepal Electricity Authority (NEA) on 2075/5/7 with installed capacity of 6 MW but its amendment letter has been received in 2075/01/27 for revised installed capacity of 5.2 MW.