OUR
PROJECTS

Our portfolio includes a range of hydropower solutions, involving a series of small to medium-sized hydropower stations along a river, each designed to capture energy from the river’s flow and enhance sustainable electricity production while minimizing environmental impact. In addition, we develop larger single power stations to generate substantial amounts of electricity from the same river, significantly contributing to the local power supply and supporting regional energy needs. Both types of projects exemplify our commitment to renewable energy and sustainable development, emphasizing environmental responsibility and the efficient harnessing of natural water resources to deliver lasting benefits to communities and the environment.

Our portfolio includes a range of hydropower solutions, involving a series of small to medium-sized hydropower stations along a river, each designed to capture energy from the river’s flow and enhance sustainable electricity production while minimizing environmental impact. In addition, we develop larger single power stations to generate substantial amounts of electricity from the same river, significantly contributing to the local power supply and supporting regional energy needs. Both types of projects exemplify our commitment to renewable energy and sustainable development, emphasizing environmental responsibility and the efficient harnessing of natural water resources to deliver lasting benefits to communities and the environment.

Seti Khola Hydropower

Seti Khola Hydropower

Jogmai Cascade Hydroelectric Project

Jogmai Cascade
Hydroelectric Project

Jogmai Hydropower

Jogmai Hydropower

Jogmai Hydro

Jogmani Khola Small Hydroelectric Project (JKSHEP) is located in Suryodaya Municipality Ward No.10 and Maijogmai Rural Municipality Ward No.1 and 3 of Illam District in the Eastern Development Region of Nepal.
7.6 MW
Installed Capacity
RoR
Type of Scheme: Run-of-RIver
42.875 GWh
Net Annual Energy
33KV/10.7Km
Voltage Level

Jogmai Cascade

Jogmai Cascade HEP is a cascade RoR scheme located just d/s of Jogmai Khola small Hydroelectric Project – 7.6 MW in Maijogmai rural municipality-3, Illan district of Nepal. The entire project component lies on the right bank of Jogmai Khola within Maijogmai Rural Municipality.
5.2 MW
Installed Capacity
RoR
Type of Scheme: Run-of-RIver
29.89 GWh
Net Annual Energy
5.26 m3/sec at Q40%
Design Discharge

Seti Khola Hydropower

Seti Khola Hydropower is a run-of-river type project located in the middle reaches of Seti Khola in Kaski District, Gandaki Province, Nepal. It includes components such as the Headworks, Setting basin, Headrace tunnel, Surge Tank, Penstock Pipe, Powerhouse, Tailrace, and Switchyard.
22 MW
Installed Capacity
RoR
Type of Scheme:
Run-of-River
133.432 GWh
Net Annual Energy
39.91m3 at Q42%
Design Discharge

Coming Soon...

Marsyangdi Hydrpower Project

Marsyangdi Hydropower project, will be a 90 MW run-of-the-river (RoR) scheme type project which is going to be developed along the Marsyangdi River in Palungtar Municipality (Gorkha), Rainas Municipality (Lamjung), and Bhanu Municipality (Tanahun), A Power Purchase Agreement (PPA) with the Nepal Electricity Authority (NEA) has already been signed on October 18, 2023, with commercial electricity generation scheduled to begin by May 4, 2029. The financial closure of the 90 MW Marsyangdi Nadi PRoR has been finalized, with four commercial banks committing Rs 10.50 billion in investment.
90 MW
Installed Capacity
RoR
Type of Scheme: Run-of-RIver
562 GWh
Net Annual Energy
118.78 m3/sec
Design Discharge

Irkhuwa Hydropower Project

Seti Khola Hydropower is a run-of-river type project located in the middle reaches of Seti Khola in Kaski District, Gandaki Province, Nepal. It includes components such as the Headworks, Setting basin, Headrace tunnel, Surge Tank, Penstock Pipe, Powerhouse, Tailrace, and Switchyard.
22 MW
Installed Capacity
RoR
Type of Scheme:
Run-of-River
133.432 GWh
Net Annual Energy
39.91m3 at Q42%
Design Discharge
Scroll to Top